Resource

Resource 2018

Mineral Resource estimate prepared by RPA for the Rio Grande Project as of August 17, 2018 is summarized below:

Class/
Oxidation
Tonnes
(Mt)
Cu
(%)
Au
(g/t)
Ag
(g/t)
Cu
(Mlb)
Au
(Koz)
Ag
(Moz)
Indicated Total71.00.300.363.2468.68157.3
Inferred Total41.00.230.282.8208.43753.6

Notes

  1. CIM (2014) definitions were followed for Mineral Resources.
  2. Mineral Resources are reported within a preliminary open pit resource shell.
  3. Mineral Resources are estimated at a net smelter return (NSR) cut-off grade of US$8.00/t for oxide, US$12.00/t for transition and US$7.50/t for sulphide. No sulphide material was captured in resource shell.
  4. Mineral Resources are estimated using a long-term gold price of US$1,400 per ounce, copper price of US$3.50 per pound.
  5. Bulk density is 2.41 t/m3 oxide 2.50 t/m3 oxide and 2.62 t/m3 sulphide.
  6. Numbers may not add due to rounding.